Renewed and energy-neutral lock and weir on the Leie in Harelbeke

27 October 2020
employés barrage éclusé
salle machine barrage éclusé
salle machine barrage éclusé
salle de contrôle barrage éclusé
230 m
Length of the new inland shipping lock
12.5 m
Width of the new inland shipping lock
4.7 m
Depth of the new inland shipping lock
230 m
Length of the new inland shipping lock
12.5 m
Width of the new inland shipping lock
4.7 m
Depth of the new inland shipping lock
Contact

Would you like to learn more about our solutions?

News
References

Construction of one of the largest Battery Energy Storage Systems in Belgium

References

Urban heat network for the Rives Ardentes eco-district